Fit4echange
The project focus lies on the increase of grid stability with a simultaneous ramp-up of e-mobility. Within Fit4echange, sensor and visualisation tools, allowing for increasing transparency in the current and prospected grid status, are to be developed as well as processes to inform the grid operator about an imminence grid congestion in advance. This information is necessary for the grid operator to react upon, i.e. by setting power limitations at the respective grid connection points via EEBUS communication.
Test locations/sites:
Duisburg region
Working groups:
E-Mobility, Grid